{"id":26,"date":"2022-11-03T07:38:56","date_gmt":"2022-11-02T23:38:56","guid":{"rendered":"https:\/\/aecom.wwferic.space\/ce75\/?page_id=26"},"modified":"2025-05-20T20:41:55","modified_gmt":"2025-05-20T12:41:55","slug":"key-considerations","status":"publish","type":"page","link":"https:\/\/ce75.wwferic.space\/en\/project-info\/key-considerations\/","title":{"rendered":"Key Considerations"},"content":{"rendered":"\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t
\n\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Project Area<\/h4>\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

We are studying various alignment options for Road P1 (Tai Ho \u2013 Sunny Bay Section), \u00a0which may include the construction of at-grade roads or viaducts along the coastline, on hillsides, or on reclaimed land. \u00a0During the study process, we will fully consider the existing conditions of the project area and the impact of the project on the nearby environment.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Tai Ho Wan<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Siu Ho Wan<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
North Lantau Transfer Station<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Ta Pang Po<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Ta Pang Po<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Cheung Tung Road<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Yam O<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Sunny Bay<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
\n\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Connectivity<\/h4>\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

The prime objective of constructing Road P1 (Tai Ho \u2013 Sunny Bay Section) is to improve the road traffic network in North Lantau. \u00a0We will identify the most suitable alignment option to connect with existing and planned major roads and development projects.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t

\n\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Reclamation Extent<\/h4>\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

For the construction of Road P1 (Tai Ho \u2013 Sunny Bay Section), it is proposed to reclaim land along the coast outside Siu Ho Wan Depot.\u00a0 This involves about 15 hectares of reclaimed land.\u00a0 The area of reclamation will maintain a certain distance from the Brothers Marine Park.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t

\n\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Conserving the Areas near Yan O Wan<\/h4>\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

There are two Sites of Archaeological Interest (Luk Keng Tsuen and Yam O) near Yan O Wan. \u00a0In order to conserve the ecological environment and avoid creating impact on these areas, the alignment of Road P1 (Tai Ho \u2013 Sunny Bay Section) will be designed to stay as far away from these areas as possible.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"

Project Area We are studying various alignment options for Road P1 (Tai Ho \u2013 Sunny Bay Section), \u00a0which may include the construction of at-grade roads or viaducts along the coastline, on hillsides, or on reclaimed land. \u00a0During the study process, we will fully consider the existing conditions of the project area and the impact of […]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":1270,"menu_order":3040,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-26","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/pages\/26","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/comments?post=26"}],"version-history":[{"count":22,"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/pages\/26\/revisions"}],"predecessor-version":[{"id":4386,"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/pages\/26\/revisions\/4386"}],"up":[{"embeddable":true,"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/pages\/1270"}],"wp:attachment":[{"href":"https:\/\/ce75.wwferic.space\/en\/wp-json\/wp\/v2\/media?parent=26"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}